当前位置: 首页-华体网页版,华体(中国)电话交换机的安装环境与注意事项

电话交换机的安装环境与注意事项

作者:admin 来源:本站 发布时间:2017-12-27 14:38:12
1、电话配线箱如有通信电缆线,则必须要安装通信电缆的屏蔽的铝层要防雷接地。
1. If there is a communication cable in the telephone wiring box, the shielded aluminum layer of the communication cable must be installed to protect the ground from lightning.
2、电话配线箱必须与主机必须有分别到时接地,否则,即使安装防雷设备也无效,因为它对地并没有形成回路。
2, the telephone wiring box must be grounded with the host separately, otherwise, even if the installation of lightning protection equipment is invalid, because it does not form a loop to the ground.
3、电话交换机机房应干燥、通风,无腐蚀气体,无强电磁干扰。
3. The machine room of the telephone exchange should be dry, ventilated, no corrosive gas and no strong electromagnetic interference.

4、电话交换机周围空间不要太拥挤,以利于散热;
4, the space around the telephone switch is not too crowded to help heat dissipation;
5、电话交换机机房湿度应保持小于80%,湿度恒定在25摄氏度左右,有条件时应安装相应设施;
5, the humidity of the telephone switch room should be kept less than 80%, the humidity is constant at about 25 degrees centigrade, and the corresponding facilities should be installed when conditions are available.
6、济南电话交换机系统避免安装在阳光直射、太冷太热或潮湿的地方(温度范围:0℃~40℃,湿度范围:60%以下);
6, Ji'nan telephone switchboard system is not installed in direct sunlight, too cold, too hot or humid (temperature range: 0 ~ 40 ~ C, humidity range: 60%).
7、避免安装在经常振动、灰尘多或会接触水、油的地方。
7, avoid installation in the place of frequent vibration, more dust or contact with water and oil.
本文由济南电话交换机系统友情奉献,更多有关的知识请点击:http://www.yehwooyeh.com我们将用的技术,真诚的态度,为您提供为的服务。我们将会陆续向大家奉献,敬请期待。
This article is based on the friendship and dedication of Ji'nan telephone exchange system and more related knowledge. Please click: http://www.yehwooyeh.com, we will provide you with the most advanced technology and the most sincere attitude to provide you with the most comprehensive service. We will continue to contribute to you and look forward to it.

本站图片均由网站所有方提供,部分图片来源于网络,如有任何疑问请时间与我们联系,未经沟通本站不承担相关法律责任!

鲁公网安备 37011202000766号

$video =